Advisory, planning, assessment, and systems engineering
Advisory, planning, assessment, and systems engineering services for organizations making consequential AI infrastructure decisions. Engagements may stand alone or connect into a pathway from readiness through implementation.
Scope is calibrated to the decision and evidence required — not a predetermined package
Independent
We work exclusively on behalf of the owner — not vendors, contractors, developers, or technology providers.
Systems-Level
Power, fiber, cooling, water, resilience, security, governance, and sustainability are evaluated as one connected system.
Decision-Centered
Every engagement begins with a 45-minute decision-framing discussion. Scope follows the decision — not a package.
01
Establish an evidence-based readiness baseline and a prioritized decision roadmap.
Duration: 6–10 weeks
02
Convert demand and existing conditions into a coordinated, phased infrastructure plan.
Duration: 10–18 weeks
03
Protect the owner's technical interests across interfaces, disciplines, contracts, and decision gates.
Duration: By program phase
04
Test infrastructure claims, conditions, dependencies, and risks before investment or commitment.
Duration: 4–8 weeks
05
Determine whether land and utility pathways can support defined demand on the required schedule.
Duration: 4–10 weeks
06
Create a credible power pathway aligned with demand, resilience, schedule, and grid conditions.
Duration: 6–14 weeks
07
Confirm that network capacity, diversity, routes, and interconnection support the operating model.
Duration: 4–8 weeks
08
Compare thermal pathways for performance, resilience, water stewardship, and lifecycle fit.
Duration: 6–12 weeks
09
Define continuity objectives and the role of storage within the complete resilience architecture.
Duration: 6–12 weeks
10
Integrate resource stewardship and measurable environmental performance into infrastructure decisions.
Duration: 6–12 weeks
11
Evaluate efficient data center performance and governance against documented proprietary criteria.
Duration: 8–14 weeks
12
Translate technical complexity into decisions for boards, executives, public leaders, and investment committees.
Duration: Retainer or decision cycle
13
Maintain decision continuity and technical controls as a selected pathway advances.
Duration: By implementation phase
14
Establish the roles, records, controls, and reporting needed to manage a complex infrastructure program.
Duration: 4–8 weeks setup; ongoing support optional
Start Here
Every engagement begins with a 45-minute decision-framing discussion to define the decision, evidence available, stakeholders, timeline, and appropriate first scope. There is no cost to this conversation.
Professional Practice Boundary
LegacyGrid AI provides advisory, planning, assessment, and systems engineering services. Final design, permitting, construction, commissioning, and professional engineering approvals must be performed by appropriately licensed and qualified parties where required.